Subject |
Notice. No |
Date |
Aircraft Delivery Recommendation Report (PDF, 41KB)
|
AC AOC-41(0) |
1 Jan 2018
|
Assignment of Aircraft Registration Marks (PDF, 29 KB) |
AC AOC-40(0)
|
24 Nov 2017 |
ANR 91 - General Operating Rules |
|
|
Guidance on General Requirements in ANR-91 (PDF, 122 KB)
|
AC 91-1-1 |
17 Sep 2018 |
Guidance on Operational Procedures for ANR-91 Operations (PDF, 157 KB)
|
AC 91-2-1(1) |
4 Nov 2021 |
Reporting and Investigation of Reportable Safety Matters (PDF, 216KB) |
AC 91-2-2 (2) |
8 Jan 2024 |
Global Reporting Format (GRF) for Runway Surface Conditions (PDF, 257KB) |
AC 91-2-3 |
4 Nov 2021 |
Guidance on Instrument and Equipment Requirements in ANR-91 (PDF, 105 KB) |
AC 91-6-1 (1) |
14 Feb 2019 |
Halon Replacement for Fire Extinguishing Agents (PDF, 125KB) |
AC 91-6-2 |
9 Feb 2023 |
Guidance on Maintenance Requirements in ANR-91 (PDF, 402KB) |
AC 91-7-1 |
6 Apr 2020 |
Guidance on Continuing Airworthiness Management for General Aviation Operators (PDF, 153KB) |
AC 91-7-2 |
20 Jul 2022 |
ANR 98 - Special Operations |
|
|
Application for an Approval to Conduct a Special Operation (PDF, 160 KB)
|
AC 98-1-1 |
17 Sep 2018 |
Operational Approval to Conduct Operations in North Atlantic High Level Airspace (PDF, 105 KB)
|
AC 98-2-1 |
17 Sep 2018 |
Operational Approval for Area Navigation RNAV-10 (PDF, 111 KB)
|
AC 98-2-2 |
17 Sep 2018 |
Operational Approval for Area Navigation RNAV-5 (PDF, 111 KB)
|
AC 98-2-3 |
17 Sep 2018 |
Operational Approval for Area Navigation RNAV-2 AND RNAV-1 (PDF, 122 KB)
|
AC 98-2-4 |
17 Sep 2018 |
Operational Approval for Required Navigation Performance RNP-4 (PDF, 118 KB)
|
AC 98-2-5 |
17 Sep 2018 |
Operational Approval for Required Navigation Performance Approach (RNP APCH) (PDF, 152 KB)
|
AC 98-2-6 |
17 Sep 2018 |
Operational Approval for Barometric Vertical Navigation (BAROVNAV) (PDF, 132 KB)
|
AC 98-2-7 |
17 Sep 2018 |
Required Navigation Performance Authorisation Required Approach (RNP ARAPCH) (PDF, 330 KB)
|
AC 98-2-8 |
17 Sep 2018 |
Operational Approval for RNP-1 (PDF, 344 KB)
|
AC 98-2-9
|
1 Nov 2019
|
Operational Approval for RNP-2 (PDF, 319 KB)
|
AC 98-2-10
|
1 Nov 2019
|
Reduced Vertical Separation Minima (RVSM) (PDF, 112 KB)
|
AC 98-3-1 |
17 Sep 2018 |
Low Visibility Operations (LVO) (PDF,433 KB) |
AC 98-4-1 (1) |
29 Jul 2019 |
Head-Up Display/Enhanced Vision System (HUD/EVS) (PDF, 340 KB)
|
AC 98-5-1 |
17 Sep 2018 |
Controller Pilot Data Link Communications and Automatic Dependent Surveillance-Contract (CPDLC and ADS-C) (PDF, 112 KB)
|
AC 98-6-1 |
17 Sep 2018 |
Automatic Dependent Surveillance-Broadcast (ADS-B) (PDF, 106 KB)
|
AC 98-6-2 |
17 Sep 2018 |
Electronic Flight Bag (EFB) (PDF, 252 KB) |
AC 98-7-1 |
17 Sep 2018 |
Extended Diversion Time Operations (EDTO) (PDF, 152 KB)
|
AC 98-8-1 |
17 Sep 2018 |
Polar Route Operations (PDF, 116 KB)
|
AC 98-9-1 |
17 Sep 2018 |
Operation of Single-Engine Turbine-Powered Aeroplane at night and/or Instrument Meter Conditions (PDF, 112 KB)
|
AC 98-11-1 |
17 Sep 2018 |
Performance-based Communication & Performance-based Surveillance (PDF, 174 KB)
|
AC 98-12-1 |
17 Sep 2018 |
ANR 99 - Breath Testing for Alcohol |
|
|
Guidance on Airline Alcohol Management Programme (AAMP) (PDF, 295 KB)
|
AC 99-3-1 (1)
|
12 Feb 2020 |
ANR 119 - Air Operator Certification |
|
|
Guidance on the Application for a Singapore AOC (PDF, 265KB) |
AC 119-1-1(1) |
23 Oct 2024 |
Guidance on the Application and Submission Requirements for Entry into Service of an Aircraft/Engine, (PDF, 186KB) |
AC 119-1-2 |
23 Oct 2024 |
Guidance on AOC Certification Requirements (PDF, 272KB) |
AC 119-2-1 (1) |
26 Nov 2021 |
Safety Management System–Safety Performance Indicators for an AOC Holder (PDF, 139 KB)
|
AC 119-2-2 |
17 Sep 2018 |
Implementation of FDAP (PDF, 133 KB)
|
AC 119-2-3 |
17 Sep 2018 |
Implementation of an AOC Holder’s Safety Management System (PDF, 642 KB)
|
AC 119-2-4 (0) |
7 Feb 2020 |
Guidance on AOC Operating Requirements (PDF, 157 KB)
|
AC 119-3-1 (1) |
21 May 2024 |
Aircraft Leasing (PDF, 161 KB)
|
AC 119-3-2 (1) |
14 Sep 2021 |
ANR 121 - Commercial Air Transport by Large Aeroplanes |
|
|
Guidance on General Requirements in ANR-121 (PDF, 403 KB)
|
AC 121-1-1 (1) |
19 Sep 2019
|
Use of Portable Electronic Devices Onboard Aircraft (PDF, 152 KB)
|
AC 121-1-2 |
17 Sep 2018 |
Carriage of Service Animals in the Passenger Cabin (PDF, 140 KB)
|
AC 121-1-3 |
17 Sep 2018 |
Carriage of Oversized or Odd-sized Items in the Passenger Cabin (PDF, 113 KB)
|
AC 121-1-4 |
17 Sep 2018 |
Guidance on Operational Procedures for ANR-121 Operations (PDF, 216 KB)
|
AC 121-2-1 (3) |
18 Nov 2021 |
Approach and Landing Accident Reduction Measures (PDF, 139 KB)
|
AC 121-2-2 |
17 Sep 2018 |
Standard Operating Procedures for Flight Crew Members (PDF, 183 KB)
|
AC 121-2-3 |
17 Sep 2018 |
Flight Crew Procedures and Training During Taxi Operations (PDF, 143 KB)
|
AC 121-2-4 |
17 Sep 2018 |
Preventing Injuries caused by Turbulence (PDF, 150 KB)
|
AC 121-2-5 |
17 Sep 2018 |
Mode Awareness and Energy State Mgt Aspects of Flight Deck (PDF, 159 KB) |
AC 121-2-6 |
17 Sep 2018 |
Management of Lithium Batteries in the Aircraft Passenger Cabin (PDF, 135 KB)
|
AC 121-2-7 |
17 Sep 2018 |
Level of Rescue and Fire Fighting Service Protection Available (PDF, 129 KB)
|
AC 121-2-8 |
17 Sep 2018 |
Procedures for Cabin Crew (PDF, 304 KB)
|
AC 121-2-9 (1) |
20 Jan 2020 |
Aircraft Tracking (PDF, 248 KB) |
AC 121-2-10 (1) |
9 Nov 2021 |
Aircraft Cargo Compartment Safety (PDF, 214KB) |
AC 121-2-11 |
18 Nov 2021 |
Guidance on Operating Limitations for ANR-121 Operations (PDF, 106 KB)
|
AC 121-3-1 |
17 Sep 2018 |
Guidance on Mass and Balance for ANR-121 Operations (PDF, 102 KB)
|
AC 121-4-1 |
17 Sep 2018 |
Carriage of Cargo in Passenger Cabin (PDF, 160 KB)
|
AC 121-4-2 (2) |
23 Dec 2021 |
Guidance on Instrument and Equipment Reqt in ANR-121 (PDF, 199KB)
|
AC121-6-1 (5)
|
18 Nov 2021 |
Effectiveness of TAWS/EGPWS Equipment (PDF, 111 KB)
|
AC 121-6-2 |
17 Sep 2018 |
Acceptable Child Restraint Devices (PDF, 497 KB)
|
AC 121-6-3 (1) |
19 Sep 2019 |
Acceptable Restraint Devices for Passengers with Restricted Mobility (PDF, 302 KB)
|
AC 121-6-4 (0)
|
19 Sep 2019
|
Guidance on Maintenance Requirements for Operations under ANR-121 (PDF, 200KB) |
AC 121-7-1 (1) |
13 Oct 2021 |
Aircraft Network Security Programme (PDF, 144KB)
|
AC 121-7-2 (1) |
11 Nov 2020 |
Guidance on Crew Requirements for ANR-121 Operations (PDF, 414 KB)
|
AC 121-8-1 (1) |
24 Aug 2020 |
Cabin Safety for Airbus A380 Aircraft (PDF, 117 KB)
|
AC 121-8-2 |
17 Sep 2018 |
Attire of Crew Members (PDF, 96 KB)
|
AC 121-8-3 |
17 Sep 2018 |
Guidance on Crew Training for ANR-121 Operations (PDF, 191 KB) |
AC 121-9-1 (1) |
3 Jan 2022 |
Flight Crew Training for an ANR-121 Operations (PDF, 128 KB)
|
AC 121-9-2 |
17 Sep 2018 |
Cabin Crew Training for ANR-121 Operations (PDF, 109 KB)
|
AC 121-9-3 |
17 Sep 2018 |
Flight Dispatcher Training and Appointment (PDF, 131 KB)
|
AC 121-9-4 |
17 Sep 2018 |
Safety and Emergency Procedures Training (PDF, 261KB) |
AC 121-9-5(2) |
14 Oct 2024 |
Training on Approach and Landing Accidents Reduction (ALAR) and Controlled Flight into Terrain (CFIT) Prevention (PDF, 122 KB)
|
AC 121-9-6 |
17 Sep 2018 |
Guidelines for the Design and Implementation of Line Oriented Flight Training (LOFT) (PDF, 162 KB)
|
AC 121-9-7 |
17 Sep 2018 |
Training on Crew Resource Management (PDF, 137 KB)
|
AC 121-9-8 |
17 Sep 2018 |
Guidance for Training on the use of Ground Proximity Warning System (GPWS) (PDF, 143 KB)
|
AC 121-9-9 |
17 Sep 2018 |
Upset Prevention and Recovery Training (UPRT) (PDF, 413 KB) |
AC 121-9-10(1) |
2 Aug 2022 |
Guidance on Crew Competency for ANR-121 Operations (PDF, 172 KB)
|
AC 121-10-1 |
17 Sep 2018 |
Guidance on Fatigue Risk Management for ANR-121 Operations (PDF, 147KB)
|
AC 121-11-1 |
17 Sep 2018 |
Fatigue Risk Management for Ultra Long Range Operations (PDF, 126 KB)
|
AC 121-11-2 |
17 Sep 2018 |
Guidance on Logs and Records for ANR-121 Operations (PDF, 113 KB)
|
AC 121-12-1 |
17 Sep 2018 |
Operations Manual for Operations under ANR-121 (PDF, 172 KB)
|
AC 121-12-2 |
17 Sep 2018 |
ANR 125 - Complex General Aviation |
|
|
Application for a Complex General Aviation Certificate (CGAC) (PDF, 172 KB)
|
AC 125-1-1 |
17 Sep 2018 |
ANR 135 - Commercial Air Transport by Helicopters and Small Aeroplanes |
|
|
Guidance on General Requirements in ANR-135 (PDF, 120 KB)
|
AC 135-1-1 |
17 Sep 2018 |
Guidance on Operational Procedures for ANR-135 Operations (PDF, 485 KB)
|
AC 135-2-1 (1) |
21 Dec 2018 |
Guidance on Operating Limitation for ANR-135 Operations (PDF, 106 KB) |
AC 135-3-1 |
17 Sep 2018 |
Guidance on Mass and Balance for ANR-135 Operations (PDF, 107 KB)
|
AC 135-4-1 |
17 Sep 2018 |
Guidance on Instrument and Equipment in ANR-135 (PDF, 416 KB) |
AC 135-6-1 (1) |
21 Dec 2018 |
Guidance on Maintenance for Operations under ANR-135 (PDF, 166 KB) |
AC 135-7-1 |
17 Sep 2018 |
Guidance on Crew Requirements for ANR-135 Operations (PDF, 98 KB)
|
AC 135-8-1 |
17 Sep 2018 |
Guidance on Crew Training for ANR-135 Operations (PDF, 128 KB) |
AC 135-9-1 |
17 Sep 2018 |
Flight Crew Training for ANR-135 Operations (PDF, 127 KB) |
AC 135-9-2 |
17 Sep 2018 |
Cabin Crew Training for ANR-135 Operations (PDF, 107 KB) |
AC 135-9-3 |
17 Sep 2018 |
Guidance on Crew Competency for ANR-135 Operations (PDF, 139 KB)
|
AC 135-10-1 |
17 Sep 2018 |
Guidance on Fatigue Risk Management for ANR-135 Operations (PDF, 148 KB)
|
AC 135-11-1 |
17 Sep 2018 |
Guidance on Logs and Records for ANR-135 Operations (PDF, 113 KB) |
AC 135-12-1 |
17 Sep 2018 |
Operations Manual for ANR-135 Operations (PDF, 168 KB) |
AC 135-12-2 |
17 Sep 2018 |
ANR 137 - Aerial Works |
|
|
Guidance on the Application for an Aerial Work Certificate (AWC) (PDF, 184 KB)
|
AC 137-1-1 |
17 Sep 2018 |